Archive

(208 Total Articles)

Page 3 of 4.

Showing only:Commercial & Institutional(79 entries)Clear filter
Empire Group breaks ground on $288M luxury tower project near ASU

Empire Group started work on a luxury tower project near ASU. For contractors and subcontractors, that means the project moves from planning into field work and will start creating demand for site, concrete, vertical construction, and trade labor; the excerpt does not say which firms are on the job or what the schedule is.

Sep 29, 2026
Dual-branded hotel cuts ribbon at Gallery Park in Mesa

The piece is about the ribbon cutting for a dual-branded hotel at Gallery Park in Mesa. For contractors and suppliers, that signals a project reaching completion rather than a new bid or permit stage, but the excerpt does not say who built it, who supplied it, or what scope of work remains.

Sep 29, 2026
Developer pays $67 million for north Phoenix auto mall near TSMC

A developer buying land for an auto mall near the TSMC site affects future site assembly and the kind of commercial and industrial support space that can follow chip plant construction. The excerpt does not say what will be built, when work starts, or whether permits or contractors are already in place.

Sep 29, 2026
Downtown Phoenix YMCA to close; demolition request surfaces

The story is about the Downtown Phoenix YMCA closing and a demolition request tied to that site. For contractors and suppliers, the main issue is whether the building is headed for teardown and what work may follow at that location; the excerpt does not say who owns the site, what will replace it, or whether any permit has been approved.

Sep 28, 2026
Bankruptcy plan could send incomplete Ritz-Carlton hotel to auction

A bankruptcy plan could push the unfinished Ritz-Carlton project into auction, which would affect the project's next contractor, subcontractors still tied to the job, and any lenders or buyers tracking the asset. The excerpt does not say who is on the hook for finishing the work, what stage the hotel is at, or whether a sale would change the buildout scope.

Sep 28, 2026
How Maricopa Community Colleges is building a new workforce: Women in Arizona construction

This is about Maricopa Community Colleges and women entering Arizona construction through workforce training. It matters to contractors and the trades because it points to future labor supply, but the excerpt does not identify any specific project, employer, permit, or construction jobsite.

Sep 25, 2026
New Hotel Coming To Novus Innovation Corridor in Tempe

A new hotel is planned for the Novus Innovation Corridor in Tempe. For contractors and trades, the relevant point is that this adds another commercial building project to the local pipeline, but the excerpt does not say who is building it, when work starts, or what trades are already committed.

Sep 24, 2026
Developer seeks rezoning for Chaparral Business Center amid weak office demand

The piece is about a rezoning request tied to the Chaparral Business Center, with the apparent aim of adapting the site as office demand stays weak. For contractors and suppliers, that points to a potential change in project type and tenant mix, but the excerpt does not say whether any permit, redesign, construction timetable, or subcontracting work has been set.

Sep 23, 2026
Sponsored
Ray's Gym Tracker
What will replace Frank Lloyd Wright-inspired hotel in west Tempe?

The story is about a west Tempe hotel site being replaced by another use, which makes it relevant to what happens to a commercial project after its original hospitality purpose ends. For contractors and suppliers, the key question is what type of redevelopment follows and whether there is new construction work tied to the change; the excerpt does not say who the new developer is, what will be built, or whether permits, bids, or timelines are in place.

Sep 23, 2026
Phoenix data center project moves ahead after site secured for $14.7M

A Phoenix data center project has advanced after the site was secured. For contractors and suppliers, the main issue is that the job is still in the site and entitlement phase, with the next work likely tied to permitting, utility coordination, and the eventual project team; the excerpt does not say who will build it or when construction starts.

Sep 22, 2026
New entertainment venue The Nox will break ground in Mesa

The piece says a new entertainment venue called The Nox is set to break ground in Mesa. For contractors and subcontractors, that means a new project is entering the build stage, but the excerpt does not say who the builder is, what trades are involved, or whether any permits or bid awards have been made.

Sep 22, 2026
Electronics distributor Avnet moves into 156,000-square-foot Tempe office

Avnet is moving into a 156,000-square-foot office in Tempe. The story matters to commercial contractors and landlords because it signals an occupied office project, but the excerpt does not say who built it, what improvements were made, or whether any construction or trade work is still pending.

Sep 22, 2026
What's being built on a vacant lot in southeast Chandler?

A vacant lot in southeast Chandler is moving into construction, which puts the project on the radar for the general contractor, trades, and nearby suppliers that will serve the job. The excerpt does not say what is being built, who the builder is, or whether permits, subcontractors, or a schedule have been announced.

Sep 22, 2026
Target replaces Harkins Theatres as anchor at Laveen retail project

The item is about a tenant swap at a Laveen retail project, with Target taking the anchor spot that had been planned for Harkins Theatres. For contractors and suppliers, the main question is whether the change affects the project schedule, fit-out needs, or tenant-specific work; the excerpt does not say what changed on the ground or whether construction timing shifted.

Sep 21, 2026
Phoenix office market shows resilience as employment grows

The piece is about Phoenix office demand and vacancy conditions in step with local employment growth. For contractors and suppliers, it points to whether office leasing and tenant work are likely to hold up, but the excerpt does not say anything about specific projects, permits, or trades involved.

Sep 20, 2026
What's being built off Cotton Lane and Peoria Avenue in Surprise?

The story is about a new Mountain America Credit Union branch tied to development at Cotton Lane and Peoria Avenue in Surprise. For contractors and suppliers, it signals another small commercial project, but the excerpt does not say who the builder is, what permits are involved, or how far along the work is.

azcentral.com and The Arizona RepublicCommercial & InstitutionalProjectsSites & Development
Sep 18, 2026
Sponsored
Newsletters Automation & Hosting Platform
Everything we know about the Legacy Park development

This is about a proposed or active development in Mesa, so it fits project-level coverage. For contractors and suppliers, the useful question is what kind of work Legacy Park will generate, but the excerpt does not say the program, scope, team, schedule, or procurement path.

Sep 16, 2026
Six New Tenants to Join Goodyear Civic Square Mixed-Use Development in Metro Phoenix

The story says six tenants are being added to the Goodyear Civic Square mixed-use project in metro Phoenix. For contractors and suppliers, that points to more buildout work, tenant fit-outs, and coordination around a project that already has a defined retail and mixed-use base; the excerpt does not say what the tenants are, when they open, or what the contract scope is.

Sep 15, 2026
Sprouts’ Phoenix HQ Marks End Of Multi-Year Site Selection Process

The piece says Sprouts has finished a long site selection process for its Phoenix headquarters. For contractors, this points to office-related work that can follow a headquarters decision, but the excerpt does not say whether any building, fit-out, or public incentives are involved.

Sep 15, 2026
Mesa approves $58B hotel, shopping Legacy Park development

Mesa approved a very large hotel and shopping development at Legacy Park. For contractors and suppliers, that points to future work in commercial building, tenant fit-out, and site-related trades, but the excerpt does not say when construction starts, what phases are included, or which firms are involved.

Sep 15, 2026
Investment giant acquires Phoenix ME

An investment group has bought Phoenix ME, which points to a change in ownership rather than a project award or site issue. For contractors and suppliers, the main question is whether the new backer changes the firm’s buying power, payment profile, or appetite for future MEP work; the excerpt does not say what happens to staff, contracts, or trading terms.

Sep 14, 2026
Rosendin Opens Chandler HQ to Support Data Center and Electrical Growth

Rosendin is adding an Arizona headquarters to handle more electrical and data center work. For contractors and suppliers, that points to more regional demand for MEP capacity, staffing, and project support tied to data center buildout. The source does not say how much work is coming, what the facility includes, or whether new hiring is planned.

Sep 14, 2026
Worker shortages hit construction as Arizona home starts drop

Arizona builders are dealing with labor shortages while housing starts fall. For contractors and suppliers, that usually means fewer active jobs, tighter crews, and slower demand for materials tied to new-home work; the source does not say which trades are most affected or how large the drop is.

Sep 14, 2026
The Phoenix CRE Brief May 7, 2026 - A brief summary of commercial real estate activity in the Phoenix Metro

This is a market roundup, not a single project announcement. For contractors and suppliers, it mainly signals where Phoenix-area commercial work may be moving, but the excerpt does not say which projects, permits, or approvals changed hands, so there is no firm read on scope, timing, or bidders.

Sep 14, 2026
Sponsored
AI-Driven Interactive Websites
Housing, retail to replace industrial plans in east Mesa development

A Mesa land-use change shifts a site away from industrial plans and toward housing with some retail. For contractors and suppliers, that points more toward residential and small commercial work than industrial buildout, but the excerpt does not say whether permits, timelines, financing, or design work are in place.

azcentral.com and The Arizona RepublicCommercial & InstitutionalPolicy & PermitsProjects
Sep 14, 2026

Showing 51–75 of 79