Archive

(208 Total Articles)

Page 4 of 6.

Showing only:Sites & Development(149 entries)Clear filter
13-acre commercial development taking shape in Cave Creek

A commercial project is taking shape in Cave Creek, which puts this squarely in project-level development coverage. It matters to the contractors and suppliers on the job and to local trades, but the excerpt does not say who the developer, builder, or tenant is, or what phase the work has reached.

Oct 4, 2026
As Casa Grande commission approves massive data center, residents ask, 'Why are we here?'

Casa Grande officials approved a large data center project, which means another major industrial site is moving through the local entitlement process. For contractors and suppliers, the next questions are site work, utility demands, permitting, and which firms get the build and subcontract packages; the excerpt does not say those details.

Oct 2, 2026
One Camelback luxury tower finally opens after years of delays

The piece is about the delayed opening of a luxury tower in Phoenix, which affects the project team, lease-up, and any contractors or suppliers still tied to closeout work. The excerpt does not say what remains unfinished, what caused the delays, or whether any construction trades are still active on site.

Oct 2, 2026
Developer aims to fill Mesa's Gateway industrial space gap

Mesa industrial vacancy and site demand in the Gateway area is the subject here. For contractors and suppliers, it points to future warehouse and logistics work if the gap turns into a project, but the excerpt does not say whether a site has been selected, permits filed, or a tenant committed.

Oct 2, 2026
San Diego engineering firm opens first Arizona office in downtown Phoenix

A San Diego engineering firm is opening its first Arizona office in downtown Phoenix. For contractors and suppliers, that signals another local design and civil-engineering player entering the market, but the excerpt does not say whether it is tied to a specific project, client, or public work.

Oct 1, 2026
News | Logistics provider ILG leases space in Tempe, Arizona, industrial hub

ILG leasing space in Tempe points to another industrial occupancy move in the Phoenix market. For contractors and suppliers, the piece matters only if the lease leads to tenant buildout, warehouse fit-out, or related site work; the excerpt does not say that any project has started or that any construction contract changed hands.

Oct 1, 2026
After 7 years, One Camelback in uptown Phoenix prepares for move-ins

The story says One Camelback in uptown Phoenix is nearing move-ins after a long buildout, so it is relevant as a commercial project reaching completion. It matters to contractors and subcontractors finishing closeout work, and to tenants and suppliers tied to occupancy and turnover, but the excerpt does not say who built it, what trades were involved, or whether any permits, leasing, or financing details changed.

Oct 1, 2026
Groundbreaking at Union in Mesa

This is a project-level start notice for a Mesa commercial development called Union. It matters to the contractors and trades on site because it marks the move from planning into active construction, but the excerpt does not say who the builder is, what scope is starting, or which trades are involved.

Sep 30, 2026
Sponsored
AI-Driven Interactive Websites
Old Town Scottsdale office redevelopment work continues with cafe to open in November

This is a project-level update on an Old Town Scottsdale office redevelopment, with a cafe opening tied to the work. It matters to the contractor team, subcontractors, and suppliers because it signals the job is still moving and now includes tenant-finish or activation work, but the excerpt does not say who is doing the work or how far along the project is.

Sep 30, 2026
Sonoran Row brings 259 townhomes to North Phoenix near TSMC

The piece is about a new 259-townhome development in North Phoenix tied to growth near TSMC. For contractors and suppliers, it signals residential construction activity adjacent to a major industrial site, but the excerpt does not say who is building it, what trades are involved, or any permit, schedule, or financing details.

Sep 30, 2026
After nearly a decade of being vacant, former Uptown Phoenix office building turns into luxury apartments

A long-vacant Phoenix office building is being repurposed into apartments. The story matters to contractors and suppliers because it points to a reuse project rather than new ground-up work, but the excerpt does not say who is doing the conversion, what permits were pulled, or what trades are involved.

Sep 29, 2026
Empire Group breaks ground on $288M luxury tower project near ASU

Empire Group started work on a luxury tower project near ASU. For contractors and subcontractors, that means the project moves from planning into field work and will start creating demand for site, concrete, vertical construction, and trade labor; the excerpt does not say which firms are on the job or what the schedule is.

Sep 29, 2026
Dual-branded hotel cuts ribbon at Gallery Park in Mesa

The piece is about the ribbon cutting for a dual-branded hotel at Gallery Park in Mesa. For contractors and suppliers, that signals a project reaching completion rather than a new bid or permit stage, but the excerpt does not say who built it, who supplied it, or what scope of work remains.

Sep 29, 2026
Developer pays $67 million for north Phoenix auto mall near TSMC

A developer buying land for an auto mall near the TSMC site affects future site assembly and the kind of commercial and industrial support space that can follow chip plant construction. The excerpt does not say what will be built, when work starts, or whether permits or contractors are already in place.

Sep 29, 2026
Downtown Phoenix YMCA to close; demolition request surfaces

The story is about the Downtown Phoenix YMCA closing and a demolition request tied to that site. For contractors and suppliers, the main issue is whether the building is headed for teardown and what work may follow at that location; the excerpt does not say who owns the site, what will replace it, or whether any permit has been approved.

Sep 28, 2026
Scottsdale firm seeks rezone for 5,157-acre industrial site west of Phoenix

A Scottsdale firm is asking for a rezoning tied to a very large industrial site west of Phoenix. For contractors and suppliers, the immediate significance is that the project is still at the entitlement stage, so any future work depends on the zoning decision and later site planning; the excerpt does not say whether permits, a contractor team, or a construction schedule are in place.

Sep 28, 2026
Sponsored
Newsletters Automation & Hosting Platform
Former State Farm office park demolished for Tempe industrial project

A former office park in Tempe has been demolished to make way for an industrial project. For contractors and suppliers, that means the site has moved from reuse planning into ground-clearing and future buildout work; the excerpt does not say who the developer is, what tenant or building type is planned, or what the schedule and costs are.

Sep 28, 2026
Another data center being planned in the Valley

A new data center is being planned near downtown Phoenix. For contractors and suppliers, the story points to another project that could turn into site work, utility coordination, and building systems demand, but the excerpt does not say who the developer is, what scope is planned, or when work would start.

Sep 28, 2026
Ahwatukee neighbors protest massive AI data center near their homes

Neighbors in Ahwatukee are opposing a large AI data center proposed near homes. The story matters for nearby contractors and suppliers because it points to a project that could face local resistance before it moves ahead.

Sep 26, 2026
News | Paving contractor commits to Phoenix industrial lease

A paving contractor has committed to a Phoenix industrial lease. The piece matters to contractors and landlords because it points to occupancy demand tied to construction-related work, but the excerpt does not say what space was leased, the size, or whether any project work will follow.

Sep 25, 2026
Texas bioscience firm expands in Scottsdale as AZ headcount tops 200

The piece is about a bioscience company adding space in Scottsdale and growing its Arizona workforce. For contractors and suppliers, the project angle is the new lab buildout and any fit-out work it pulls in; for the trades, the staffing growth suggests ongoing demand, but the excerpt does not say what scope of construction is involved or which firms are on the job.

Sep 25, 2026
Steel fabrication company invests $20M to open second East Valley factory

A steel fabricator is opening a second East Valley factory with a sizable capital investment. For contractors and suppliers, that points to more local fabrication capacity and another industrial site to watch for equipment, utility, and buildout work; the excerpt does not say whether this is a new build, an expansion of an existing site, or name the contractor team.

Sep 25, 2026
New Hotel Coming To Novus Innovation Corridor in Tempe

A new hotel is planned for the Novus Innovation Corridor in Tempe. For contractors and trades, the relevant point is that this adds another commercial building project to the local pipeline, but the excerpt does not say who is building it, when work starts, or what trades are already committed.

Sep 24, 2026
Controversial West Valley data center moves toward Glendale annexation vote

The piece is about a proposed data center project in Glendale and the annexation vote needed to move it forward. For contractors and suppliers, the immediate relevance is site control and whether the project can advance into permitting and delivery work; the excerpt does not say who would build it, what trades are involved, or whether any contract has been awarded.

Sep 23, 2026
Sponsored
AI-Driven Interactive Websites
30-year-old killed when 3 construction workers fall off a bridge while on the job, officials say

Three construction workers fell from a bridge while on the job, and one was killed. The piece matters for contractors, site supervisors, and trade crews because it points to fall hazards, rescue response, and jobsite safety enforcement, but the excerpt does not say which project it was, who the contractor was, or what safety measures were in place.

Sep 23, 2026

Showing 76–100 of 149